Cost Guide

Interactive Model Cost & Features: Exhibition & Sales Centre

An interactive architectural model is not a model with some LEDs glued in. It is a physical computing system wrapped in acrylic and plywood. Every touch sensor, every programmed lighting sequence, every projected animation layer is a piece of software talking to hardware, integrated into a handcrafted scale model.

Defining Interactivity: Touch, Light, Sound, and Projection

The simplest tier of interactivity is push-button lighting. A visitor presses a button labeled “Phase 2” and the corresponding building zone illuminates. This requires basic LED circuits and a microcontroller. The electronics cost is modest, typically adding 15 to 25 percent to the base model cost.

Cost Tiers: From Simple LED Touch to Full Projection Mapping

The mid-tier introduces capacitive touch and dynamic control. Visitors touch a building directly, and a chip detects the change in capacitance, triggering that building to glow and a nearby screen to display floor plans. Costs add 30 to 50 percent to the base model. The user experience feels magical because the interface is invisible.

The Electronics Behind the Experience

The highest tier is full projection mapping and sensor fusion. Projectors mounted above the model cast animated data, traffic flows, or shadow studies directly onto the physical surface. A depth sensor tracks a visitor’s hand gestures. Costs for this tier begin at 150,000 AED above the base model and can exceed 400,000 AED for complex installations.

Integration with Physical Models vs Standalone Digital

Integration is the discipline that makes or breaks interactive models. The physical model maker and the electronics engineer must work in the same space, with the same timeline. Cabling channels must be designed into the model base before the top layers are applied. Sensors must be calibrated after painting, because paint thickness affects capacitive response.

Real Budgets and Lead Times for UAE Projects

These interdependencies mean that interactive model projects cannot be built in silos. Our team handles everything under one roof, which is why we can guarantee an interactive model will work on day one, not after three service visits.

Interactive Architectural Models → Government & Cultural Institutions → Real Estate & Architecture →